I want to especially acknowledge my gratefulness to the group that worked together with me. There was a very sweet spirit in the group and it was a pleasure working with all of you. This was a Nehemiah group who had a "heart to work." Thanks Nick, Terra and Andrea for the pizza too. Here we see Donny turning the lift around on the back forty. We had a full day of painting and bulb replacing. Thanks to all of you who helped. -------------Next work days are Jan 9th and Feb. 13th 2010.------- 9:00 am to 2:oo pm. on Saturdays.
Monday, November 23, 2009
Monday, November 16, 2009
Next work /paint day on Sat. Nov. 21st 9:00 am to 4:00 pm
Check your schedule to see if you can come to the church and help. We want to finish the painting in the upstairs hallway. It was spackled two years ago and still needs to be painted. If we could call on the -------------------WOMEN OF PAINTH----------------------to bring this hallway to completion ---that would be great!!! We may need to come a few days early and make sure the spackle is sanded and ready to paint. Nick N. will be there to lend advice, support and two strong professional arms. Thanks Nick!!!!
Friday, November 13, 2009
This is in the kitchen and needs to be replaced. If you are driving by Menards here are the numbers. ---For two F-96 or F72/T72 slimline lamp. Line 1.45 amps 750 volts------ Cat No. 806-BR-TC-P. You can also enlarge the picture and read it. Buy two while your at it. Put the extra one in the boiler room.
There is still work to do on the rain gutter/downspouts. The parts are in the garage. Basically we need to prevent water from going into the ground sewer pipes or they will freeze in the winter and bust our pipes. We will cap it and divert it to on top of the ground.