Wednesday, April 15, 2009
Toilets are in need of TLC.
I was told this toilet is leaking and the brown spot on the floor does give evidence. We may be wise to change out all the inner workings of these toilets. I have looked in the tanks and am seeing some very worn out parts that are going to be problematic. This is in the women's bathroom down stairs by the kitchen.-------------------- Any plumbers or adventuresome souls ready to tackle this challenge? Got a comment? Got some time some Saturday? Weekday?
Can we stack along the wall?
Missions Closet
Tuesday, April 7, 2009
Do you see something that needs to be fixed?
Sunday, April 5, 2009
Paint and then Large white boards. Thanks Joy W. and Anna W.
Besides needing to be painted "Sunrise Yellow" on the wall to the left side it also gets painted "Sand Dune" on the other walls. This room and two more off the Fellowship Hall get large White boards. Supplies: Sheet rock anchors,(they are in storage room with paint supplies) tape measure, level, (see Lyn for placement). Make sure the rooms are all done being painted before installing boards.-----Looks great! Probably needs a second coat. Thanks Joy and Anna and Ryan!
Inventory lists and shelves
Lights and ballast
These long fluorescent lights are the button style. The ones you see here are having a ballast problem. This is in the kitchen. Kevin told me that the ballast should be taken out and brought to Ace hardware and they will match it. Is any one into this type of repair? Leave a comment or call Jerry or if you have more info about this let us know.--------new------------new-------------------I am learning little by little who has been doing things around the church. Ray G. knows about the ballast and how to fix them. Give him a call if you want to help him. You can hold onto the ladder or hand him the bulbs or tell him he is a good man!
Saturday, April 4, 2009
Canopy in Progress------- Painted black
We are in the process of determining the right way to replace the cloth canopy on the west side of the church. We are looking into using a metal standing seam roof.
Here is a look at the old canopy:------UPDATE-----------Dale S. and Josiah W. cleaned up the frame and painted it black--and the posts too. Next step is to have it covered with metal and installed again.-------------------Update-------------We are on hold on this 800.00 dollar project for lack of funds. We have the color picked out and Harry R. stands ready to haul the frame to the factory to have the canopy made but----no money in the budget. Stay tuned!
It gets ripped quite often from the ice falling on it.
Subscribe to:
Posts (Atom)